Groundbreaking for MIST-61 RADVE Zughotel Module
After months of track planning with Peter and acquiring 75% of the needed Märklin C-tracks and turnouts, the official groundbreaking ceremony for the MIST-61 RADVE Zughotel module begins. The 3 managing directors of RailAdventure were invited for the groundbreaking in Braunschweig, which signals the construction of the 4.5 by 0.65 meter module that make up of 4 segments. Initial Test Tracks Assembled and Spot Checks Carried Out A compact version of the track layout were assembled to check the length and the spacing between tracks. For a 4.5 meter long module, it takes up the whole length of my living … Continue reading Groundbreaking for MIST-61 RADVE Zughotel Module